A sex toy RFQ gets an accurate factory quote only when every supplier prices the same project. The first request should lock ten variables: project type, model or drawing revision, quantities, material, colour, logo method, packaging, destination markets, target warehouse date, and an Incoterms® 2020 rule with an exact named place.
Add the test reports required for the intended market, the quote currency, and the validity period. If any commercial or technical variable changes later, issue a new RFQ revision and request a revised quotation rather than comparing the new requirement with an old price.
Quick rule: “Catalogue and best price, please” produces a placeholder. A complete sex toy RFQ produces a comparable quotation.
Keep the entire request in one revision-controlled message and separate sample quantity, first-order quantity, and annual forecast.
Who Should Use This Sex Toy RFQ Guide?
This guide is written for brand owners, wholesalers, importers, ecommerce sellers, and distributors sourcing from China. It is designed for business buyers comparing stock wholesale, private-label, OEM, or ODM projects—not consumers buying a single unit.
A useful RFQ lets a buyer compare price, setup cost, tooling, packaging, testing, freight responsibility, payment, lead time, and warranty on a like-for-like basis. It also gives the factory enough information to identify assumptions before issuing the quote.



Why “Send Me Your Best Price” Stalls
A factory cannot price what it cannot see. The same silicone vibrator may vary materially in cost according to motor grade, battery capacity, shell construction, surface finish, colour, packaging, order quantity, and destination market.
If those inputs remain open, the supplier either guesses low and revises the price when the real requirement appears, or guesses high to cover uncertainty. In both cases the buyer receives a number that is difficult to compare. The gap is information, not necessarily price.
Most delays also come from a brief scattered across emails and chat messages. A revision-controlled request keeps the commercial, technical, artwork, packaging, and logistics inputs together so the supplier can confirm what is included and excluded.
The 10 Essential Fields of an Accurate Sex Toy RFQ
Put all ten fields in the first message. Replace the examples below with your own requirements and attach the relevant model reference, drawing, artwork, or specification.
| Field | Example | Why it changes the quote |
|---|---|---|
| Project type | Private label | Stock, private label, OEM, and ODM run on different cost and timing models |
| SKU or drawing revision | Model WY-1042 or drawing REV-C dated 12 May | Fixes the exact product and revision being priced |
| Quantities | Sample 3; first order 500; forecast 6,000 | Sets the price tier, material purchase, and production planning |
| Material | Specified silicone shell and ABS base | Changes cost, feel, moulding process, and test scope |
| Colour | Pantone 2035 C body; black base | Custom colours may carry setup and minimum quantities per colour |
| Logo | Laser engraved, 15 mm, base underside; vector attached | Method, size, position, and surface determine setup and lead time |
| Packaging | Retail colour box; artwork ready; dieline required | Packaging often adds tooling, print setup, minimums, and approval time |
| Destination countries | Germany and France | Influences testing, labels, language, logistics, and documentation |
| Target warehouse date | Hamburg warehouse by 20 November | Determines whether the production and freight route are realistic |
| Incoterm and named place | FCA Shenzhen, China, Incoterms® 2020 | Defines delivery responsibilities, cost allocation, and transfer of risk |
Two additional lines make the reply usable: list the reports you need for the intended markets, then state the quote currency and requested validity. WINYI’s OEM and ODM service outlines which requirements can be changed on production-ready models and which require new development.



Write Incoterms and Destination Correctly
Write the three-letter rule, exact named place, and year. “FCA Shenzhen, China, Incoterms® 2020” or “FOB Yantian Port, China, Incoterms® 2020” is specific enough to price; “FOB price” is not.
The International Chamber of Commerce describes Incoterms® rules as 11 three-letter terms used to clarify delivery tasks, costs, and risks. Choose the rule that fits the actual transport plan and confirm it with a forwarder or trade professional. FOB and CIF are intended for sea and inland-waterway transport; FCA, CPT, CIP, or DAP may be more suitable for courier, air, or multimodal movement.
Treat DDP carefully. It is not simply seller-paid freight. It may require the seller to manage import clearance, duty, and tax obligations, while some destinations require a local importer or registration the factory cannot hold. If requesting DDP, identify the exact destination, importer of record, and tax assumptions.
Suggested RFQ wording: Requested term: [FCA / FOB / CPT / CIP / DAP / DDP] [exact named place or port], Incoterms® 2020. Please state what is included, where risk transfers, and any import-clearance or tax assumptions.


Separate Sample, First Order, and Forecast Quantities
State three numbers, not one. Sample, first-order, and forecast quantities price differently, and combining them can hide the tier the factory is actually quoting.
- Sample quantity: often one to five units for evaluation. Ask the sample price, lead time, sample type, and whether the charge is credited against the first order.
- First-order quantity: the batch you will actually purchase. This should be the primary unit-price tier in the quotation.
- Annual forecast: state that it is non-binding unless the purchase agreement says otherwise. Ask what conditions apply to any forecast-based tier.
Name the type of sample you need
| Sample type | What it tells you |
|---|---|
| Stock selection | Size, feel, and function of an existing model; it does not approve your colour or logo |
| Customized sample | Your colour, logo, or material on an existing structure |
| Engineering sample | Whether a new structure works; it may be hand-finished |
| Pre-production sample | What bulk should look like from intended tooling, materials, and line process |
Do not use an unapproved colour, logo, or packaging sample for final marketing content. Final photography should use an approved pre-production configuration.
Compliance Inputs That Change a Factory Quote
Name the exact countries where the product will be sold rather than writing “worldwide.” Test scope follows the market and configuration, and body-contact material, electronics, batteries, wireless functions, and retail packaging do not share one universal report set.
Ask which documents already exist for the exact quoted model and which are specific to your configuration. Check the report date, standard edition, models covered, issuing laboratory, and whether any design change triggers new testing. “Fully certified” is not evidence. The WINYI certification overview describes commonly requested schemes, but a qualified compliance professional should confirm the current requirements for each market.
Rechargeable products also need battery transport documentation. Request the UN 38.3 test summary that matches the configuration being shipped and review the current UN Manual of Tests and Criteria with the relevant logistics and compliance professionals. For app-enabled products, include wireless, firmware, privacy, and platform requirements in the RFQ; the app-controlled toy development page shows the additional scope.



Three Sex Toy RFQ Templates by Project Type
Stock wholesale
Send the exact model code, sample/first-order/forecast quantities, destination countries, packaging as-is or neutral, target warehouse date, and Incoterm with named place. Ask for unit prices by tier, carton dimensions, gross weight, lead time from the named trigger, and what is in stock versus produced to order.
Private label
Send all stock-wholesale inputs plus vector logo artwork, printing method, placement on product and box, Pantone reference if colour changes, and packaging artwork status. Ask for setup charges, minimums per colour and logo, dielines, approval stages, and whether a pre-production sample is included.
ODM or new development
Send concept sketches or reference products, function set, size and hardness targets, material preference, target markets, forecast, and launch date. Target retail price and target cost are optional commercial inputs that help the factory propose a specification within budget and may be shared under an NDA. Ask for development stages, tooling cost and ownership, pilot samples, tooling-related minimums, and exclusivity terms.



Use a Quotation Comparison Sheet
A unit price alone is not comparable. Move each supplier’s reply into the same rows and compare the revision, scope, payment, and delivery assumptions before selecting a factory.
| Row | Check |
|---|---|
| Quotation revision and date | Which RFQ revision the quotation answers |
| Currency and validity | Currency quoted and how long the price holds |
| Unit price and inclusions | Product only or also box, manual, cable, insert, and inner packing |
| Tooling and NRE | Mould, engineering charges, ownership, refund, or amortisation |
| Packaging setup | Plate, dieline, insert, and artwork rounds included |
| Testing | Reports included, separately quoted, or commissioned by buyer |
| Sample fee and credit | Fee, sample type, and credit against the first order |
| Freight and Incoterm | Same rule and named place on both quotes |
| Taxes and duties | Who pays and which assumptions apply |
| Lead-time trigger | Days from deposit, artwork approval, or sample approval |
| Payment milestones | Deposit, balance trigger, and accepted methods |
| Warranty | Coverage, defect definition, claim evidence, and freight responsibility |
| Exclusions | Read this first; unexpected cost usually sits here |
How a Factory Reads Your RFQ
The factory first identifies the project type because stock, private-label, and development orders follow different timelines. It then checks material and colour against available production options, confirms whether the logo method suits the surface, prices packaging, maps the destination to testing and labelling, and checks the warehouse date against production and shipping.
Every information gap becomes an assumption in the quotation. That is why the best sex toy RFQ is not the longest email; it is the one that closes the right variables. Supplier capability should also be reviewed before price comparison, following the adult toy factory partnership checklist.
Final Checklist Before You Send
- All ten fields appear in one revision-controlled message.
- Sample, first order, and non-binding forecast are listed separately.
- Destination countries are named individually.
- Incoterms® 2020 rule includes the exact named place.
- Logo and packaging artwork are attached, or their status is stated.
- The requested date is the warehouse arrival date, not “ASAP.”
- Required reports, currency, validity, and response deadline are included.
- Questions are listed clearly so the supplier can answer each one.
Share only the information needed for an accurate quote. Artwork, retail pricing, unreleased designs, and customer data may be commercially sensitive, so use an NDA and ask how project files are stored and controlled.
Send a Revision-Controlled RFQ to WINYI
Include your project type, model or drawing revision, three quantities, target countries, customization, warehouse date, and Incoterm with named place.
Frequently Asked Questions
What is the minimum information a factory needs to quote?
Provide project type, SKU or drawing revision, sample/first-order/forecast quantities, material, colour, logo, packaging, destination countries, warehouse date, and an Incoterms® 2020 rule with named place. Less than that produces an estimate based on assumptions.
Should I tell the supplier my target price?
It is optional, but a realistic target can help the factory propose a specification within budget. You do not need to reveal the full margin structure. For unreleased projects, share commercial targets under an NDA.
How many suppliers should receive the same RFQ?
Three to five is a practical range when resources allow, not a rule. More important is that every supplier receives the same RFQ revision, specification, Incoterm, named place, and response deadline.
Do I need finished packaging artwork before requesting a quote?
No, but state the artwork stage. “Artwork ready,” “dieline required,” and “concept only” imply different work, setup charges, and lead times.
What is the difference between an estimate and a quotation?
An estimate indicates a probable price while inputs remain open. A usable quotation identifies the product revision, quantity tier, inclusions, exclusions, currency, validity, payment, lead-time trigger, and delivery rule.
Should sample cost be included in the RFQ?
Yes. Ask for the sample type, unit count, charge, shipping method, preparation time, approval scope, and whether the fee is credited against the first production order.
How should I request quantity price tiers?
Give the sample quantity, realistic first order, and non-binding annual forecast separately. Then ask the supplier to show the minimum order and price tiers with the conditions required to reach each tier.
Which Incoterm should be used for a sex toy shipment?
The correct rule depends on the transport mode, destination, and responsibilities the parties can perform. Confirm the rule with a qualified trade or logistics professional, then write the exact named place and “Incoterms® 2020” in the request and quotation.
Why do destination countries affect the unit price?
Destinations can change testing, labelling, manual languages, plug or charging requirements, tax assumptions, freight options, and documentation. “Worldwide” is too broad for a precise quote.
What files should be attached to a private-label RFQ?
Attach the model reference, vector logo, placement drawing, colour reference, packaging artwork if available, barcode data, manual language requirements, and any approved specification or limit sample references.
What should an ODM quotation separate?
It should separate design and engineering, prototype or sample charges, tooling, testing, packaging development, pilot production, bulk unit price, intellectual-property or exclusivity terms, and delivery milestones.
When should I request a revised factory quote?
Request a new revision whenever quantity, product specification, material, colour, logo method, packaging, target market, date, reports, currency, payment, or Incoterm changes. Compare only quotations answering the same RFQ revision.